The ITAC Statistics page displays the average assessment results for the selected criteria.
NAICS 3335 Metalworking machinery manufacturing

102

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $393k 50k
MMBtu
$9.38
- Electrical $253k 4,061k
kWh
$0.072
- Natural Gas $50k 7.8k
MMBtu
$7.30

800

Recommendations

7.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $43k 3.9k
MMBtu
7.8%
- Electrical $24k 379k
kWh
9.3%
- Natural Gas $9.2k -
MMBtu
-
Waste $0.9k
Productivity/Other $36k
TOTAL $80k
*May be negative reflecting an increased cost component required to save energy and costs overall

100

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $396k 50k
MMBtu
$9.29
- Electrical $255k 4,119k
kWh
$0.071
- Natural Gas $50k 7.9k
MMBtu
$7.30

391

Implemented Recommendations

3.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $22k 1.7k
MMBtu
3.4%
- Electrical $10k 168k
kWh
4.1%
- Natural Gas $5.7k -
MMBtu
-
Waste $0.2k
Productivity/Other $29k
TOTAL $51k
*May be negative reflecting an increased cost component required to save energy and costs overall