ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Air-conditioning and warm air heating equipment and commercial and industrial refrigeration equipmen
SIC 2+ Digits Required
3+ Characters Required for Products

74

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $722k 97k
MMBtu
$8.67
- Electrical $432k 7,444k
kWh
$0.068
- Natural Gas $133k 21k
MMBtu
$7.34

570

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $90k 8.9k
MMBtu
9.1%
- Electrical $59k 867k
kWh
11.7%
- Natural Gas $12k -
MMBtu
-
Waste $1.2k
Productivity/Other $25k
TOTAL $116k
*May be negative reflecting an increased cost component required to save energy and costs overall

64

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $738k 102k
MMBtu
$8.52
- Electrical $430k 7,682k
kWh
$0.067
- Natural Gas $145k 23k
MMBtu
$7.57

237

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $36k 4.0k
MMBtu
3.9%
- Electrical $23k 386k
kWh
5.0%
- Natural Gas $4.3k -
MMBtu
-
Waste $0.3k
Productivity/Other $10k
TOTAL $47k
*May be negative reflecting an increased cost component required to save energy and costs overall