ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Ventilation, heating, air-conditioning, and commercial refrigeration equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

126

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $619k 79k
MMBtu
$8.85
- Electrical $358k 5,945k
kWh
$0.068
- Natural Gas $122k 18k
MMBtu
$8.12

992

Recommendations

7.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $85k 7.9k
MMBtu
10.0%
- Electrical $54k 770k
kWh
13.0%
- Natural Gas $11k -
MMBtu
-
Waste $0.8k
Productivity/Other $21k
TOTAL $107k
*May be negative reflecting an increased cost component required to save energy and costs overall

116

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $615k 80k
MMBtu
$8.60
- Electrical $359k 6,103k
kWh
$0.066
- Natural Gas $117k 18k
MMBtu
$8.08

424

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $28k 2.9k
MMBtu
3.6%
- Electrical $17k 285k
kWh
4.7%
- Natural Gas $3.3k -
MMBtu
-
Waste $0.3k
Productivity/Other $12k
TOTAL $40k
*May be negative reflecting an increased cost component required to save energy and costs overall