ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Photographic and photocopying equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

3

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,805k 242k
MMBtu
$7.47
- Electrical $1,076k 17,632k
kWh
$0.060
- Natural Gas $329k 61k
MMBtu
$5.48

28

Recommendations

9.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $60k 8.2k
MMBtu
3.4%
- Electrical $48k 802k
kWh
4.6%
- Natural Gas $0.6k -
MMBtu
-
Waste -
Productivity/Other $10k
TOTAL $71k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $228k 30k
MMBtu
$7.48
- Electrical $118k 2,099k
kWh
$0.056
- Natural Gas $52k 9.0k
MMBtu
$5.83

3

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $26k 3.7k
MMBtu
12.1%
- Electrical $20k 361k
kWh
17.2%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other -
TOTAL $26k
*May be negative reflecting an increased cost component required to save energy and costs overall