ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Optical instrument and lens manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

21

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $403k 44k
MMBtu
$10.19
- Electrical $276k 4,066k
kWh
$0.077
- Natural Gas $14k 1.8k
MMBtu
$8.01

135

Recommendations

6.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $41k 3.8k
MMBtu
8.7%
- Electrical $30k 371k
kWh
9.1%
- Natural Gas $1.9k -
MMBtu
-
Waste -
Productivity/Other $15k
TOTAL $56k
*May be negative reflecting an increased cost component required to save energy and costs overall

20

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $407k 45k
MMBtu
$10.09
- Electrical $279k 4,136k
kWh
$0.076
- Natural Gas $15k 1.9k
MMBtu
$8.41

63

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $19k 1.8k
MMBtu
4.0%
- Electrical $15k 176k
kWh
4.3%
- Natural Gas $0.7k -
MMBtu
-
Waste -
Productivity/Other $12k
TOTAL $30k
*May be negative reflecting an increased cost component required to save energy and costs overall