ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Commercial and service industry machinery manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

4

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $428k 30k
MMBtu
$12.24
- Electrical $224k 2,425k
kWh
$0.069
- Natural Gas $25k 4.9k
MMBtu
$5.61

41

Recommendations

10.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $70k 5.1k
MMBtu
17.2%
- Electrical $40k 502k
kWh
20.7%
- Natural Gas $0.4k -
MMBtu
-
Waste -
Productivity/Other $42k
TOTAL $113k
*May be negative reflecting an increased cost component required to save energy and costs overall

3

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $192k 19k
MMBtu
$10.29
- Electrical $70k 1,516k
kWh
$0.048
- Natural Gas $16k 3.1k
MMBtu
$5.75

10

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $12k 0.8k
MMBtu
4.0%
- Electrical $3.6k 74k
kWh
4.9%
- Natural Gas $0.4k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $12k
*May be negative reflecting an increased cost component required to save energy and costs overall