ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Commercial and service industry machinery manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

3

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $192k 19k
MMBtu
$10.29
- Electrical $70k 1,516k
kWh
$0.048
- Natural Gas $16k 3.1k
MMBtu
$5.75

27

Recommendations

9.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $48k 4.1k
MMBtu
21.9%
- Electrical $17k 400k
kWh
26.4%
- Natural Gas $0.3k -
MMBtu
-
Waste -
Productivity/Other $0.2k
TOTAL $48k
*May be negative reflecting an increased cost component required to save energy and costs overall

2

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $150k 18k
MMBtu
$8.76
- Electrical $68k 1,348k
kWh
$0.052
- Natural Gas $12k 3.8k
MMBtu
$1.52

5

Implemented Recommendations

2.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $7.0k 0.7k
MMBtu
4.2%
- Electrical $3.9k 72k
kWh
5.4%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other -
TOTAL $7.0k
*May be negative reflecting an increased cost component required to save energy and costs overall