The ITAC Statistics page displays the average assessment results for the selected criteria.
NAICS 33331 Commercial and service industry machinery manufacturing

67

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $460k 56k
MMBtu
$9.70
- Electrical $255k 4,323k
kWh
$0.069
- Natural Gas $73k 12k
MMBtu
$7.13

494

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $69k 5.5k
MMBtu
9.7%
- Electrical $45k 534k
kWh
12.3%
- Natural Gas $2.7k -
MMBtu
-
Waste $0.1k
Productivity/Other $10k
TOTAL $79k
*May be negative reflecting an increased cost component required to save energy and costs overall

58

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $389k 47k
MMBtu
$9.63
- Electrical $210k 3,554k
kWh
$0.068
- Natural Gas $65k 10k
MMBtu
$6.91

197

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $24k 2.3k
MMBtu
4.9%
- Electrical $14k 225k
kWh
6.3%
- Natural Gas ($-5.2)k -
MMBtu
-
Waste $0.1k
Productivity/Other $5.2k
TOTAL $30k
*May be negative reflecting an increased cost component required to save energy and costs overall