The ITAC Statistics page displays the average assessment results for the selected criteria.
67
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $460k | 56k |
MMBtu
|
$9.70 |
- Electrical | $255k | 4,323k |
kWh
|
$0.069 |
- Natural Gas | $73k | 12k |
MMBtu
|
$7.13 |
494
Recommendations
7.4
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $69k | 5.5k |
MMBtu
|
9.7% |
- Electrical | $45k | 534k |
kWh
|
12.3% |
- Natural Gas | $2.7k | - |
MMBtu
|
- |
Waste | $0.1k | |||
Productivity/Other | $10k | |||
TOTAL | $79k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
58
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $389k | 47k |
MMBtu
|
$9.63 |
- Electrical | $210k | 3,554k |
kWh
|
$0.068 |
- Natural Gas | $65k | 10k |
MMBtu
|
$6.91 |
197
Implemented Recommendations
3.4
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $24k | 2.3k |
MMBtu
|
4.9% |
- Electrical | $14k | 225k |
kWh
|
6.3% |
- Natural Gas | ($-5.2)k | - |
MMBtu
|
- |
Waste | $0.1k | |||
Productivity/Other | $5.2k | |||
TOTAL | $30k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |