ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Other industrial machinery manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

45

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $345k 47k
MMBtu
$9.81
- Electrical $180k 3,219k
kWh
$0.065
- Natural Gas $54k 6.5k
MMBtu
$6.72

370

Recommendations

8.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $64k 5.3k
MMBtu
11.2%
- Electrical $38k 516k
kWh
16.0%
- Natural Gas $9.4k -
MMBtu
-
Waste $2.3k
Productivity/Other $38k
TOTAL $104k
*May be negative reflecting an increased cost component required to save energy and costs overall

42

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $356k 49k
MMBtu
$9.74
- Electrical $188k 3,363k
kWh
$0.065
- Natural Gas $55k 6.6k
MMBtu
$6.61

166

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $30k 2.8k
MMBtu
5.7%
- Electrical $19k 274k
kWh
8.1%
- Natural Gas $1.7k -
MMBtu
-
Waste $0.1k
Productivity/Other $7.8k
TOTAL $38k
*May be negative reflecting an increased cost component required to save energy and costs overall