ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Other industrial machinery manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

42

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $356k 49k
MMBtu
$9.68
- Electrical $188k 3,375k
kWh
$0.065
- Natural Gas $55k 6.6k
MMBtu
$6.68

350

Recommendations

8.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $68k 5.5k
MMBtu
11.2%
- Electrical $39k 539k
kWh
16.0%
- Natural Gas $10k -
MMBtu
-
Waste $2.4k
Productivity/Other $37k
TOTAL $107k
*May be negative reflecting an increased cost component required to save energy and costs overall

37

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $366k 51k
MMBtu
$9.53
- Electrical $190k 3,459k
kWh
$0.063
- Natural Gas $59k 6.2k
MMBtu
$6.97

137

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $28k 2.7k
MMBtu
5.3%
- Electrical $17k 262k
kWh
7.6%
- Natural Gas $1.9k -
MMBtu
-
Waste $0.1k
Productivity/Other $4.9k
TOTAL $33k
*May be negative reflecting an increased cost component required to save energy and costs overall