ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Printing machinery and equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

7

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $868k 148k
MMBtu
$8.78
- Electrical $504k 10,129k
kWh
$0.068
- Natural Gas $133k 18k
MMBtu
$6.93

61

Recommendations

8.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $66k 7.3k
MMBtu
4.9%
- Electrical $35k 711k
kWh
7.0%
- Natural Gas $22k -
MMBtu
-
Waste $3.5k
Productivity/Other $4.6k
TOTAL $74k
*May be negative reflecting an increased cost component required to save energy and costs overall

7

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $868k 148k
MMBtu
$8.78
- Electrical $504k 10,129k
kWh
$0.068
- Natural Gas $133k 18k
MMBtu
$6.93

28

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $22k 2.9k
MMBtu
2.0%
- Electrical $12k 283k
kWh
2.8%
- Natural Gas $5.5k -
MMBtu
-
Waste $0.6k
Productivity/Other $1.6k
TOTAL $24k
*May be negative reflecting an increased cost component required to save energy and costs overall