ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Semiconductor machinery manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

11

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $343k 43k
MMBtu
$11.08
- Electrical $242k 3,764k
kWh
$0.093
- Natural Gas $38k 4.9k
MMBtu
$8.43

76

Recommendations

6.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $48k 3.6k
MMBtu
8.4%
- Electrical $30k 356k
kWh
9.5%
- Natural Gas $7.0k -
MMBtu
-
Waste $3.8k
Productivity/Other $4.3k
TOTAL $56k
*May be negative reflecting an increased cost component required to save energy and costs overall

8

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $299k 38k
MMBtu
$9.34
- Electrical $215k 3,295k
kWh
$0.076
- Natural Gas $31k 4.1k
MMBtu
$7.21

28

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $21k 2.2k
MMBtu
5.8%
- Electrical $16k 214k
kWh
6.5%
- Natural Gas ($-0.6)k -
MMBtu
-
Waste $0.6k
Productivity/Other $0.1k
TOTAL $22k
*May be negative reflecting an increased cost component required to save energy and costs overall