ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Food product machinery manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

25

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $429k 64k
MMBtu
$8.14
- Electrical $250k 4,357k
kWh
$0.065
- Natural Gas $84k 12k
MMBtu
$6.56

192

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $53k 5.6k
MMBtu
8.7%
- Electrical $35k 542k
kWh
12.5%
- Natural Gas $11k -
MMBtu
-
Waste $2.0k
Productivity/Other $13k
TOTAL $68k
*May be negative reflecting an increased cost component required to save energy and costs overall

23

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $432k 65k
MMBtu
$8.16
- Electrical $253k 4,504k
kWh
$0.064
- Natural Gas $76k 12k
MMBtu
$6.50

78

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $20k 1.8k
MMBtu
2.8%
- Electrical $12k 175k
kWh
3.9%
- Natural Gas $5.0k -
MMBtu
-
Waste -
Productivity/Other $0.7k
TOTAL $21k
*May be negative reflecting an increased cost component required to save energy and costs overall