The ITAC Statistics page displays the average assessment results for the selected criteria.
100
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $487k | 82k |
MMBtu
|
$9.37 |
- Electrical | $262k | 5,793k |
kWh
|
$0.068 |
- Natural Gas | $79k | 11k |
MMBtu
|
$6.92 |
781
Recommendations
7.8
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $68k | 6.3k |
MMBtu
|
7.7% |
- Electrical | $38k | 620k |
kWh
|
10.7% |
- Natural Gas | $18k | - |
MMBtu
|
- |
Waste | $2.2k | |||
Productivity/Other | $27k | |||
TOTAL | $98k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
91
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $503k | 87k |
MMBtu
|
$9.23 |
- Electrical | $271k | 6,101k |
kWh
|
$0.068 |
- Natural Gas | $79k | 11k |
MMBtu
|
$6.80 |
335
Implemented Recommendations
3.7
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $25k | 2.4k |
MMBtu
|
2.8% |
- Electrical | $16k | 236k |
kWh
|
3.9% |
- Natural Gas | $2.8k | - |
MMBtu
|
- |
Waste | $0.1k | |||
Productivity/Other | $9.2k | |||
TOTAL | $34k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |