ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Industrial machinery manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

95

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $497k 85k
MMBtu
$9.15
- Electrical $270k 6,016k
kWh
$0.068
- Natural Gas $81k 11k
MMBtu
$6.85

749

Recommendations

7.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $70k 6.5k
MMBtu
7.6%
- Electrical $39k 633k
kWh
10.5%
- Natural Gas $19k -
MMBtu
-
Waste $2.3k
Productivity/Other $27k
TOTAL $99k
*May be negative reflecting an increased cost component required to save energy and costs overall

84

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $518k 91k
MMBtu
$8.82
- Electrical $277k 6,385k
kWh
$0.064
- Natural Gas $84k 11k
MMBtu
$6.79

303

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $24k 2.4k
MMBtu
2.6%
- Electrical $15k 232k
kWh
3.6%
- Natural Gas $3.0k -
MMBtu
-
Waste $0.1k
Productivity/Other $8.3k
TOTAL $33k