ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Mining machinery and equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

21

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $592k 72k
MMBtu
$11.28
- Electrical $315k 4,338k
kWh
$1.38
- Natural Gas $153k 27k
MMBtu
$7.06

177

Recommendations

8.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $80k 5.3k
MMBtu
7.4%
- Electrical $42k 518k
kWh
12.0%
- Natural Gas $27k -
MMBtu
-
Waste $0.7k
Productivity/Other $37k
TOTAL $117k
*May be negative reflecting an increased cost component required to save energy and costs overall

19

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $622k 76k
MMBtu
$11.36
- Electrical $330k 4,538k
kWh
$1.52
- Natural Gas $163k 29k
MMBtu
$6.87

81

Implemented Recommendations

4.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $31k 2.7k
MMBtu
3.6%
- Electrical $16k 265k
kWh
5.8%
- Natural Gas $9.2k -
MMBtu
-
Waste $0.1k
Productivity/Other $14k
TOTAL $45k
*May be negative reflecting an increased cost component required to save energy and costs overall