ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Mining machinery and equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

22

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $579k 70k
MMBtu
$11.37
- Electrical $310k 4,238k
kWh
$1.32
- Natural Gas $146k 26k
MMBtu
$7.14

188

Recommendations

8.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $79k 5.3k
MMBtu
7.6%
- Electrical $42k 514k
kWh
12.1%
- Natural Gas $26k -
MMBtu
-
Waste $0.6k
Productivity/Other $35k
TOTAL $115k
*May be negative reflecting an increased cost component required to save energy and costs overall

21

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $599k 72k
MMBtu
$11.37
- Electrical $321k 4,390k
kWh
$1.38
- Natural Gas $153k 27k
MMBtu
$7.20

93

Implemented Recommendations

4.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $29k 2.5k
MMBtu
3.5%
- Electrical $15k 248k
kWh
5.6%
- Natural Gas $8.4k -
MMBtu
-
Waste $0.1k
Productivity/Other $12k
TOTAL $42k
*May be negative reflecting an increased cost component required to save energy and costs overall