The ITAC Statistics page displays the average assessment results for the selected criteria.
69
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $552k | 148k |
MMBtu
|
$9.22 |
- Electrical | $331k | 12,792k |
kWh
|
$0.46 |
- Natural Gas | $104k | 16k |
MMBtu
|
$6.49 |
558
Recommendations
8.1
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $75k | 6.6k |
MMBtu
|
4.5% |
- Electrical | $46k | 646k |
kWh
|
5.0% |
- Natural Gas | $14k | - |
MMBtu
|
- |
Waste | $2.3k | |||
Productivity/Other | $24k | |||
TOTAL | $101k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
66
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $565k | 154k |
MMBtu
|
$9.08 |
- Electrical | $340k | 13,291k |
kWh
|
$0.48 |
- Natural Gas | $107k | 17k |
MMBtu
|
$6.22 |
264
Implemented Recommendations
4.0
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $40k | 3.9k |
MMBtu
|
2.5% |
- Electrical | $26k | 380k |
kWh
|
2.9% |
- Natural Gas | $4.7k | - |
MMBtu
|
- |
Waste | $1.4k | |||
Productivity/Other | $11k | |||
TOTAL | $52k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |