ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Construction machinery manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

47

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $740k 107k
MMBtu
$8.28
- Electrical $385k 7,072k
kWh
$0.063
- Natural Gas $196k 34k
MMBtu
$5.99

353

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $84k 8.2k
MMBtu
7.7%
- Electrical $46k 796k
kWh
11.3%
- Natural Gas $22k -
MMBtu
-
Waste $2.6k
Productivity/Other $76k
TOTAL $162k
*May be negative reflecting an increased cost component required to save energy and costs overall

42

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $750k 108k
MMBtu
$8.22
- Electrical $381k 7,181k
kWh
$0.061
- Natural Gas $202k 34k
MMBtu
$6.21

131

Implemented Recommendations

3.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $37k 3.7k
MMBtu
3.4%
- Electrical $18k 358k
kWh
5.0%
- Natural Gas $10k -
MMBtu
-
Waste $0.8k
Productivity/Other $59k
TOTAL $97k
*May be negative reflecting an increased cost component required to save energy and costs overall