ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Lawn and garden tractor and home lawn and garden equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

10

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $648k 83k
MMBtu
$8.31
- Electrical $368k 5,926k
kWh
$0.069
- Natural Gas $158k 23k
MMBtu
$6.56

81

Recommendations

8.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $56k 6.9k
MMBtu
8.2%
- Electrical $35k 669k
kWh
11.3%
- Natural Gas $18k -
MMBtu
-
Waste $4.4k
Productivity/Other $25k
TOTAL $85k
*May be negative reflecting an increased cost component required to save energy and costs overall

10

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $648k 83k
MMBtu
$8.31
- Electrical $368k 5,926k
kWh
$0.069
- Natural Gas $158k 23k
MMBtu
$6.56

30

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $11k 1.9k
MMBtu
2.3%
- Electrical $8.4k 188k
kWh
3.2%
- Natural Gas $0.8k -
MMBtu
-
Waste -
Productivity/Other $3.0k
TOTAL $14k