ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Farm machinery and equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

34

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $637k 91k
MMBtu
$8.97
- Electrical $305k 5,723k
kWh
$0.065
- Natural Gas $249k 32k
MMBtu
$6.03

251

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $48k 5.5k
MMBtu
6.1%
- Electrical $30k 540k
kWh
9.4%
- Natural Gas $6.8k -
MMBtu
-
Waste $0.4k
Productivity/Other $29k
TOTAL $78k
*May be negative reflecting an increased cost component required to save energy and costs overall

34

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $637k 91k
MMBtu
$8.97
- Electrical $305k 5,723k
kWh
$0.065
- Natural Gas $249k 32k
MMBtu
$6.03

132

Implemented Recommendations

3.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $23k 2.2k
MMBtu
2.4%
- Electrical $12k 212k
kWh
3.7%
- Natural Gas $6.8k -
MMBtu
-
Waste $0.1k
Productivity/Other $14k
TOTAL $37k
*May be negative reflecting an increased cost component required to save energy and costs overall