The ITAC Statistics page displays the average assessment results for the selected criteria.
44
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $639k | 90k |
MMBtu
|
$8.82 |
- Electrical | $319k | 5,770k |
kWh
|
$0.066 |
- Natural Gas | $228k | 30k |
MMBtu
|
$6.15 |
332
Recommendations
7.5
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $50k | 5.8k |
MMBtu
|
6.5% |
- Electrical | $32k | 570k |
kWh
|
9.9% |
- Natural Gas | $9.2k | - |
MMBtu
|
- |
Waste | $1.3k | |||
Productivity/Other | $28k | |||
TOTAL | $79k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
44
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $639k | 90k |
MMBtu
|
$8.82 |
- Electrical | $319k | 5,770k |
kWh
|
$0.066 |
- Natural Gas | $228k | 30k |
MMBtu
|
$6.15 |
162
Implemented Recommendations
3.7
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $21k | 2.1k |
MMBtu
|
2.4% |
- Electrical | $11k | 207k |
kWh
|
3.6% |
- Natural Gas | $5.4k | - |
MMBtu
|
- |
Waste | $0.1k | |||
Productivity/Other | $11k | |||
TOTAL | $32k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |