ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Agriculture, construction, and mining machinery manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

4

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $609k 55k
MMBtu
$19.27
- Electrical $446k 3,708k
kWh
$6.96
- Natural Gas $66k 13k
MMBtu
$4.97

21

Recommendations

5.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $139k 6.2k
MMBtu
11.1%
- Electrical $76k 601k
kWh
16.2%
- Natural Gas $2.4k -
MMBtu
-
Waste -
Productivity/Other $56k
TOTAL $195k
*May be negative reflecting an increased cost component required to save energy and costs overall

4

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $609k 55k
MMBtu
$19.27
- Electrical $446k 3,708k
kWh
$6.96
- Natural Gas $66k 13k
MMBtu
$4.97

11

Implemented Recommendations

2.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $70k 1.8k
MMBtu
3.2%
- Electrical $12k 174k
kWh
4.7%
- Natural Gas $2.4k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $70k
*May be negative reflecting an increased cost component required to save energy and costs overall