ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Machinery manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

903

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $553k 84k
MMBtu
$9.17
- Electrical $309k 6,123k
kWh
$0.097
- Natural Gas $117k 20k
MMBtu
$7.29

7,014

Recommendations

7.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $74k 6.8k
MMBtu
8.1%
- Electrical $44k 667k
kWh
10.9%
- Natural Gas $13k -
MMBtu
-
Waste $1.6k
Productivity/Other $30k
TOTAL $106k
*May be negative reflecting an increased cost component required to save energy and costs overall

847

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $558k 86k
MMBtu
$9.01
- Electrical $311k 6,256k
kWh
$0.098
- Natural Gas $119k 21k
MMBtu
$7.23

3,049

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $28k 2.8k
MMBtu
3.2%
- Electrical $17k 269k
kWh
4.3%
- Natural Gas $4.1k -
MMBtu
-
Waste $0.4k
Productivity/Other $15k
TOTAL $44k