ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Machinery manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

813

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $560k 88k
MMBtu
$8.92
- Electrical $313k 6,367k
kWh
$0.099
- Natural Gas $121k 21k
MMBtu
$7.21

6,376

Recommendations

7.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $71k 6.7k
MMBtu
7.6%
- Electrical $42k 651k
kWh
10.2%
- Natural Gas $14k -
MMBtu
-
Waste $1.7k
Productivity/Other $27k
TOTAL $100k
*May be negative reflecting an increased cost component required to save energy and costs overall

754

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $564k 90k
MMBtu
$8.78
- Electrical $314k 6,520k
kWh
$0.10
- Natural Gas $124k 22k
MMBtu
$7.17

2,743

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $28k 2.9k
MMBtu
3.2%
- Electrical $17k 278k
kWh
4.3%
- Natural Gas $4.4k -
MMBtu
-
Waste $0.4k
Productivity/Other $15k
TOTAL $43k
*May be negative reflecting an increased cost component required to save energy and costs overall