ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS All other miscellaneous fabricated metal product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

117

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $432k 54k
MMBtu
$9.23
- Electrical $231k 3,809k
kWh
$0.068
- Natural Gas $95k 14k
MMBtu
$7.14

912

Recommendations

7.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $61k 5.9k
MMBtu
11.0%
- Electrical $36k 578k
kWh
15.2%
- Natural Gas $11k -
MMBtu
-
Waste $1.2k
Productivity/Other $19k
TOTAL $81k
*May be negative reflecting an increased cost component required to save energy and costs overall

110

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $417k 51k
MMBtu
$9.28
- Electrical $218k 3,620k
kWh
$0.069
- Natural Gas $98k 14k
MMBtu
$7.28

415

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $25k 2.8k
MMBtu
5.4%
- Electrical $16k 273k
kWh
7.5%
- Natural Gas $3.9k -
MMBtu
-
Waste $0.9k
Productivity/Other $15k
TOTAL $41k
*May be negative reflecting an increased cost component required to save energy and costs overall