ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Fabricated pipe and pipe fitting manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

41

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $491k 65k
MMBtu
$9.07
- Electrical $251k 4,330k
kWh
$0.065
- Natural Gas $120k 19k
MMBtu
$6.41

332

Recommendations

8.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $79k 5.0k
MMBtu
7.7%
- Electrical $30k 491k
kWh
11.3%
- Natural Gas $3.8k -
MMBtu
-
Waste $4.7k
Productivity/Other $45k
TOTAL $129k
*May be negative reflecting an increased cost component required to save energy and costs overall

37

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $524k 70k
MMBtu
$8.82
- Electrical $266k 4,621k
kWh
$0.065
- Natural Gas $132k 21k
MMBtu
$6.89

146

Implemented Recommendations

3.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $24k 2.9k
MMBtu
4.1%
- Electrical $16k 279k
kWh
6.0%
- Natural Gas $1.0k -
MMBtu
-
Waste $2.9k
Productivity/Other $29k
TOTAL $56k
*May be negative reflecting an increased cost component required to save energy and costs overall