ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Fabricated pipe and pipe fitting manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

33

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $498k 70k
MMBtu
$8.61
- Electrical $255k 4,656k
kWh
$0.061
- Natural Gas $130k 21k
MMBtu
$6.90

291

Recommendations

8.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $89k 5.5k
MMBtu
7.8%
- Electrical $32k 534k
kWh
11.5%
- Natural Gas $4.3k -
MMBtu
-
Waste $2.7k
Productivity/Other $46k
TOTAL $137k
*May be negative reflecting an increased cost component required to save energy and costs overall

31

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $521k 75k
MMBtu
$7.86
- Electrical $267k 4,913k
kWh
$0.059
- Natural Gas $138k 22k
MMBtu
$6.76

122

Implemented Recommendations

3.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $24k 3.2k
MMBtu
4.3%
- Electrical $17k 311k
kWh
6.3%
- Natural Gas $1.2k -
MMBtu
-
Waste $0.1k
Productivity/Other $24k
TOTAL $48k
*May be negative reflecting an increased cost component required to save energy and costs overall