ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Other metal valve and pipe fitting manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

16

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $522k 77k
MMBtu
$7.91
- Electrical $367k 6,900k
kWh
$0.055
- Natural Gas $40k 6.7k
MMBtu
$3.39

121

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $94k 16k
MMBtu
20.5%
- Electrical $79k 1,551k
kWh
22.5%
- Natural Gas ($-1.5)k -
MMBtu
-
Waste $0.5k
Productivity/Other $78k
TOTAL $172k
*May be negative reflecting an increased cost component required to save energy and costs overall

14

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $471k 74k
MMBtu
$7.56
- Electrical $339k 6,530k
kWh
$0.053
- Natural Gas $36k 6.7k
MMBtu
$3.17

50

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $46k 8.1k
MMBtu
11.0%
- Electrical $35k 788k
kWh
12.1%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other $86k
TOTAL $133k
*May be negative reflecting an increased cost component required to save energy and costs overall