The ITAC Statistics page displays the average assessment results for the selected criteria.
NAICS 332913 Plumbing fixture fitting and trim manufacturing

11

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $866k 112k
MMBtu
$7.88
- Electrical $601k 8,853k
kWh
$0.074
- Natural Gas $118k 22k
MMBtu
$4.69

94

Recommendations

8.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $113k 12k
MMBtu
10.6%
- Electrical $83k 1,160k
kWh
13.1%
- Natural Gas $7.2k -
MMBtu
-
Waste $3.3k
Productivity/Other $8.7k
TOTAL $125k
*May be negative reflecting an increased cost component required to save energy and costs overall

10

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $927k 120k
MMBtu
$7.98
- Electrical $653k 9,511k
kWh
$0.078
- Natural Gas $125k 22k
MMBtu
$4.79

24

Implemented Recommendations

2.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $20k 2.2k
MMBtu
1.8%
- Electrical $13k 213k
kWh
2.2%
- Natural Gas $1.7k -
MMBtu
-
Waste -
Productivity/Other $0.3k
TOTAL $20k