ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Plumbing fixture fitting and trim manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

11

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $866k 112k
MMBtu
$7.88
- Electrical $601k 8,853k
kWh
$0.074
- Natural Gas $118k 22k
MMBtu
$4.69

94

Recommendations

8.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $113k 12k
MMBtu
10.6%
- Electrical $83k 1,160k
kWh
13.1%
- Natural Gas $7.2k -
MMBtu
-
Waste $3.3k
Productivity/Other $8.7k
TOTAL $125k
*May be negative reflecting an increased cost component required to save energy and costs overall

9

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $753k 108k
MMBtu
$7.66
- Electrical $544k 8,308k
kWh
$0.078
- Natural Gas $116k 23k
MMBtu
$4.32

18

Implemented Recommendations

2.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $14k 1.9k
MMBtu
1.8%
- Electrical $11k 187k
kWh
2.2%
- Natural Gas $1.9k -
MMBtu
-
Waste -
Productivity/Other $0.3k
TOTAL $14k
*May be negative reflecting an increased cost component required to save energy and costs overall