The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC | 2+ Digits Required | |
NAICS | Fluid power valve and hose fitting manufacturing | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
33
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $540k | 66k |
MMBtu
|
$8.85 |
- Electrical | $338k | 5,789k |
kWh
|
$0.068 |
- Natural Gas | $40k | 6.5k |
MMBtu
|
$7.17 |
279
Recommendations
8.5
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $96k | 7.6k |
MMBtu
|
11.5% |
- Electrical | $48k | 738k |
kWh
|
12.7% |
- Natural Gas | $5.7k | - |
MMBtu
|
- |
Waste | $4.9k | |||
Productivity/Other | $44k | |||
TOTAL | $145k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
28
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $543k | 65k |
MMBtu
|
$8.87 |
- Electrical | $335k | 5,804k |
kWh
|
$0.067 |
- Natural Gas | $36k | 5.8k |
MMBtu
|
$7.02 |
81
Implemented Recommendations
2.9
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $59k | 2.8k |
MMBtu
|
4.3% |
- Electrical | $17k | 273k |
kWh
|
4.7% |
- Natural Gas | $1.7k | - |
MMBtu
|
- |
Waste | $0.3k | |||
Productivity/Other | $4.3k | |||
TOTAL | $63k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |