ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Industrial valve manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

37

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $634k 79k
MMBtu
$9.94
- Electrical $419k 6,539k
kWh
$0.075
- Natural Gas $64k 11k
MMBtu
$5.95

301

Recommendations

8.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $81k 9.1k
MMBtu
11.6%
- Electrical $59k 892k
kWh
13.6%
- Natural Gas ($-1.8)k -
MMBtu
-
Waste $0.4k
Productivity/Other $21k
TOTAL $102k
*May be negative reflecting an increased cost component required to save energy and costs overall

33

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $537k 66k
MMBtu
$9.84
- Electrical $352k 5,594k
kWh
$0.073
- Natural Gas $47k 7.8k
MMBtu
$5.26

150

Implemented Recommendations

4.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $45k 4.4k
MMBtu
6.6%
- Electrical $30k 427k
kWh
7.6%
- Natural Gas $2.3k -
MMBtu
-
Waste $0.0k
Productivity/Other $7.0k
TOTAL $52k
*May be negative reflecting an increased cost component required to save energy and costs overall