ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Metal valve manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

103

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $588k 75k
MMBtu
$9.32
- Electrical $387k 6,323k
kWh
$0.071
- Natural Gas $56k 9.5k
MMBtu
$5.65

838

Recommendations

8.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $92k 9.8k
MMBtu
13.2%
- Electrical $61k 961k
kWh
15.2%
- Natural Gas $2.3k -
MMBtu
-
Waste $2.1k
Productivity/Other $37k
TOTAL $131k
*May be negative reflecting an increased cost component required to save energy and costs overall

97

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $609k 78k
MMBtu
$9.00
- Electrical $403k 6,600k
kWh
$0.069
- Natural Gas $58k 9.9k
MMBtu
$5.92

339

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $44k 3.8k
MMBtu
4.9%
- Electrical $23k 372k
kWh
5.6%
- Natural Gas $1.9k -
MMBtu
-
Waste $0.1k
Productivity/Other $16k
TOTAL $60k
*May be negative reflecting an increased cost component required to save energy and costs overall