ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Metal valve manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

96

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $612k 78k
MMBtu
$8.98
- Electrical $404k 6,648k
kWh
$0.069
- Natural Gas $57k 9.8k
MMBtu
$5.70

789

Recommendations

8.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $93k 10k
MMBtu
13.1%
- Electrical $62k 998k
kWh
15.0%
- Natural Gas $1.8k -
MMBtu
-
Waste $2.3k
Productivity/Other $37k
TOTAL $133k
*May be negative reflecting an increased cost component required to save energy and costs overall

90

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $623k 80k
MMBtu
$8.95
- Electrical $410k 6,757k
kWh
$0.069
- Natural Gas $59k 10k
MMBtu
$5.75

324

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $46k 4.0k
MMBtu
5.0%
- Electrical $24k 390k
kWh
5.8%
- Natural Gas $2.0k -
MMBtu
-
Waste $0.1k
Productivity/Other $17k
TOTAL $64k
*May be negative reflecting an increased cost component required to save energy and costs overall