ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Metal valve manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

94

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $613k 79k
MMBtu
$8.99
- Electrical $403k 6,655k
kWh
$0.069
- Natural Gas $58k 9.9k
MMBtu
$5.69

778

Recommendations

8.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $93k 10k
MMBtu
12.9%
- Electrical $62k 992k
kWh
14.9%
- Natural Gas $1.9k -
MMBtu
-
Waste $2.0k
Productivity/Other $38k
TOTAL $133k
*May be negative reflecting an increased cost component required to save energy and costs overall

88

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $615k 79k
MMBtu
$8.99
- Electrical $406k 6,677k
kWh
$0.069
- Natural Gas $58k 9.9k
MMBtu
$5.72

316

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $47k 4.1k
MMBtu
5.1%
- Electrical $24k 396k
kWh
5.9%
- Natural Gas $2.0k -
MMBtu
-
Waste $0.1k
Productivity/Other $18k
TOTAL $65k
*May be negative reflecting an increased cost component required to save energy and costs overall