ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Metal valve manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

94

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $614k 79k
MMBtu
$8.99
- Electrical $404k 6,661k
kWh
$0.069
- Natural Gas $58k 9.9k
MMBtu
$5.69

778

Recommendations

8.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $93k 10k
MMBtu
12.9%
- Electrical $62k 992k
kWh
14.9%
- Natural Gas $1.9k -
MMBtu
-
Waste $2.0k
Productivity/Other $38k
TOTAL $133k
*May be negative reflecting an increased cost component required to save energy and costs overall

84

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $551k 72k
MMBtu
$8.90
- Electrical $364k 6,111k
kWh
$0.068
- Natural Gas $49k 8.5k
MMBtu
$5.40

299

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $46k 4.2k
MMBtu
5.9%
- Electrical $25k 410k
kWh
6.7%
- Natural Gas $1.7k -
MMBtu
-
Waste $0.1k
Productivity/Other $19k
TOTAL $65k
*May be negative reflecting an increased cost component required to save energy and costs overall