ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Metal coating, engraving (except jewelry and silverware), and allied services to manufacturers
SIC 2+ Digits Required
3+ Characters Required for Products

99

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $801k 123k
MMBtu
$8.91
- Electrical $262k 5,098k
kWh
$0.075
- Natural Gas $398k 69k
MMBtu
$7.17

786

Recommendations

7.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $111k 5.6k
MMBtu
4.6%
- Electrical $44k 551k
kWh
10.8%
- Natural Gas $49k -
MMBtu
-
Waste $1.7k
Productivity/Other $19k
TOTAL $132k
*May be negative reflecting an increased cost component required to save energy and costs overall

88

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $868k 132k
MMBtu
$8.94
- Electrical $285k 5,578k
kWh
$0.074
- Natural Gas $430k 74k
MMBtu
$7.49

334

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $34k 2.3k
MMBtu
1.7%
- Electrical $12k 220k
kWh
3.9%
- Natural Gas $14k -
MMBtu
-
Waste $0.9k
Productivity/Other $2.5k
TOTAL $37k
*May be negative reflecting an increased cost component required to save energy and costs overall