ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Metal heat treating
SIC 2+ Digits Required
3+ Characters Required for Products

50

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $650k 109k
MMBtu
$9.33
- Electrical $241k 3,375k
kWh
$0.094
- Natural Gas $301k 73k
MMBtu
$8.42

372

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $97k 4.3k
MMBtu
3.9%
- Electrical $32k 419k
kWh
12.4%
- Natural Gas $41k -
MMBtu
-
Waste $5.5k
Productivity/Other $11k
TOTAL $114k
*May be negative reflecting an increased cost component required to save energy and costs overall

44

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $644k 116k
MMBtu
$8.16
- Electrical $230k 3,483k
kWh
$0.087
- Natural Gas $316k 80k
MMBtu
$7.79

146

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $28k 1.7k
MMBtu
1.5%
- Electrical $11k 168k
kWh
4.8%
- Natural Gas $12k -
MMBtu
-
Waste $6.2k
Productivity/Other $6.7k
TOTAL $41k
*May be negative reflecting an increased cost component required to save energy and costs overall