The ITAC Statistics page displays the average assessment results for the selected criteria.
237
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $635k | 94k |
MMBtu
|
$9.19 |
- Electrical | $235k | 4,127k |
kWh
|
$0.078 |
- Natural Gas | $285k | 51k |
MMBtu
|
$8.05 |
1,818
Recommendations
7.7
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $87k | 5.3k |
MMBtu
|
5.6% |
- Electrical | $38k | 518k |
kWh
|
12.5% |
- Natural Gas | $36k | - |
MMBtu
|
- |
Waste | $3.4k | |||
Productivity/Other | $10k | |||
TOTAL | $101k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
213
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $642k | 98k |
MMBtu
|
$8.78 |
- Electrical | $240k | 4,308k |
kWh
|
$0.075 |
- Natural Gas | $287k | 53k |
MMBtu
|
$7.85 |
795
Implemented Recommendations
3.7
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $29k | 2.3k |
MMBtu
|
2.4% |
- Electrical | $13k | 229k |
kWh
|
5.3% |
- Natural Gas | $12k | - |
MMBtu
|
- |
Waste | $2.0k | |||
Productivity/Other | $2.2k | |||
TOTAL | $33k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |