ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Precision turned product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

30

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $374k 41k
MMBtu
$9.69
- Electrical $262k 3,414k
kWh
$0.079
- Natural Gas $41k 5.9k
MMBtu
$6.93

230

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $48k 4.3k
MMBtu
10.6%
- Electrical $35k 422k
kWh
12.4%
- Natural Gas $6.0k -
MMBtu
-
Waste $0.5k
Productivity/Other $77k
TOTAL $125k
*May be negative reflecting an increased cost component required to save energy and costs overall

28

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $355k 38k
MMBtu
$9.71
- Electrical $248k 3,159k
kWh
$0.080
- Natural Gas $41k 5.9k
MMBtu
$6.84

90

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $21k 1.9k
MMBtu
5.0%
- Electrical $15k 188k
kWh
5.9%
- Natural Gas $3.0k -
MMBtu
-
Waste $0.1k
Productivity/Other $71k
TOTAL $92k