ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Precision turned product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

29

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $370k 41k
MMBtu
$9.62
- Electrical $260k 3,407k
kWh
$0.079
- Natural Gas $41k 6.0k
MMBtu
$6.81

215

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $41k 4.0k
MMBtu
9.7%
- Electrical $32k 386k
kWh
11.3%
- Natural Gas $4.4k -
MMBtu
-
Waste $0.6k
Productivity/Other $79k
TOTAL $121k
*May be negative reflecting an increased cost component required to save energy and costs overall

26

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $355k 38k
MMBtu
$9.71
- Electrical $241k 3,117k
kWh
$0.079
- Natural Gas $44k 6.4k
MMBtu
$7.36

86

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $21k 1.9k
MMBtu
5.1%
- Electrical $15k 190k
kWh
6.1%
- Natural Gas $3.2k -
MMBtu
-
Waste $0.1k
Productivity/Other $76k
TOTAL $97k
*May be negative reflecting an increased cost component required to save energy and costs overall