ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Machine shops
SIC 2+ Digits Required
3+ Characters Required for Products

107

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $307k 36k
MMBtu
$12.02
- Electrical $185k 3,125k
kWh
$0.077
- Natural Gas $30k 4.3k
MMBtu
$7.89

768

Recommendations

7.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $50k 4.5k
MMBtu
12.4%
- Electrical $34k 441k
kWh
14.1%
- Natural Gas $4.1k -
MMBtu
-
Waste $3.0k
Productivity/Other $40k
TOTAL $93k
*May be negative reflecting an increased cost component required to save energy and costs overall

97

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $323k 39k
MMBtu
$11.60
- Electrical $197k 3,335k
kWh
$0.076
- Natural Gas $32k 4.5k
MMBtu
$8.00

301

Implemented Recommendations

3.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $18k 2.0k
MMBtu
5.1%
- Electrical $12k 194k
kWh
5.8%
- Natural Gas $1.2k -
MMBtu
-
Waste $3.0k
Productivity/Other $9.9k
TOTAL $31k
*May be negative reflecting an increased cost component required to save energy and costs overall