ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Machine shops
SIC 2+ Digits Required
3+ Characters Required for Products

92

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $329k 40k
MMBtu
$11.31
- Electrical $201k 3,420k
kWh
$0.075
- Natural Gas $35k 4.9k
MMBtu
$8.27

658

Recommendations

7.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $47k 4.4k
MMBtu
11.0%
- Electrical $32k 428k
kWh
12.5%
- Natural Gas $4.6k -
MMBtu
-
Waste $3.5k
Productivity/Other $45k
TOTAL $96k
*May be negative reflecting an increased cost component required to save energy and costs overall

78

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $335k 43k
MMBtu
$10.73
- Electrical $202k 3,644k
kWh
$0.072
- Natural Gas $38k 5.5k
MMBtu
$8.41

255

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $18k 2.1k
MMBtu
5.0%
- Electrical $12k 209k
kWh
5.7%
- Natural Gas $1.4k -
MMBtu
-
Waste $3.8k
Productivity/Other $4.0k
TOTAL $26k