ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Machine shops
SIC 2+ Digits Required
3+ Characters Required for Products

76

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $334k 44k
MMBtu
$9.87
- Electrical $205k 3,739k
kWh
$0.069
- Natural Gas $39k 5.6k
MMBtu
$8.11

543

Recommendations

7.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $40k 4.0k
MMBtu
9.1%
- Electrical $26k 391k
kWh
10.5%
- Natural Gas $5.0k -
MMBtu
-
Waste $2.8k
Productivity/Other $43k
TOTAL $86k
*May be negative reflecting an increased cost component required to save energy and costs overall

74

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $337k 44k
MMBtu
$9.90
- Electrical $208k 3,780k
kWh
$0.070
- Natural Gas $39k 5.7k
MMBtu
$8.16

239

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $18k 2.2k
MMBtu
5.0%
- Electrical $13k 218k
kWh
5.8%
- Natural Gas $1.5k -
MMBtu
-
Waste $2.5k
Productivity/Other $4.2k
TOTAL $25k
*May be negative reflecting an increased cost component required to save energy and costs overall