ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Machine shops
SIC 2+ Digits Required
3+ Characters Required for Products

105

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $310k 37k
MMBtu
$11.68
- Electrical $188k 3,177k
kWh
$0.076
- Natural Gas $31k 4.3k
MMBtu
$7.85

756

Recommendations

7.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $48k 4.6k
MMBtu
12.3%
- Electrical $34k 445k
kWh
14.0%
- Natural Gas $4.1k -
MMBtu
-
Waste $3.1k
Productivity/Other $41k
TOTAL $92k
*May be negative reflecting an increased cost component required to save energy and costs overall

97

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $323k 39k
MMBtu
$11.60
- Electrical $197k 3,335k
kWh
$0.076
- Natural Gas $32k 4.5k
MMBtu
$8.00

295

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $17k 2.0k
MMBtu
5.0%
- Electrical $11k 190k
kWh
5.7%
- Natural Gas $1.2k -
MMBtu
-
Waste $3.0k
Productivity/Other $9.9k
TOTAL $30k
*May be negative reflecting an increased cost component required to save energy and costs overall