ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Other fabricated wire product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

37

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $688k 96k
MMBtu
$8.74
- Electrical $399k 6,566k
kWh
$0.068
- Natural Gas $169k 28k
MMBtu
$6.37

327

Recommendations

8.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $87k 9.3k
MMBtu
9.7%
- Electrical $51k 907k
kWh
13.8%
- Natural Gas $11k -
MMBtu
-
Waste $1.6k
Productivity/Other $11k
TOTAL $99k
*May be negative reflecting an increased cost component required to save energy and costs overall

35

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $699k 98k
MMBtu
$8.63
- Electrical $406k 6,746k
kWh
$0.067
- Natural Gas $174k 29k
MMBtu
$6.53

128

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $34k 3.5k
MMBtu
3.5%
- Electrical $18k 337k
kWh
5.0%
- Natural Gas $4.8k -
MMBtu
-
Waste -
Productivity/Other $0.2k
TOTAL $34k
*May be negative reflecting an increased cost component required to save energy and costs overall