ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Other fabricated wire product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

42

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $657k 88k
MMBtu
$9.57
- Electrical $379k 6,135k
kWh
$0.072
- Natural Gas $155k 25k
MMBtu
$6.45

354

Recommendations

8.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $84k 8.6k
MMBtu
9.8%
- Electrical $48k 843k
kWh
13.7%
- Natural Gas $11k -
MMBtu
-
Waste $1.4k
Productivity/Other $23k
TOTAL $109k
*May be negative reflecting an increased cost component required to save energy and costs overall

39

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $663k 91k
MMBtu
$9.07
- Electrical $386k 6,314k
kWh
$0.069
- Natural Gas $158k 26k
MMBtu
$6.54

132

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $31k 3.1k
MMBtu
3.4%
- Electrical $16k 302k
kWh
4.8%
- Natural Gas $4.3k -
MMBtu
-
Waste -
Productivity/Other $0.1k
TOTAL $31k
*May be negative reflecting an increased cost component required to save energy and costs overall