ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Spring manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

20

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $468k 62k
MMBtu
$9.67
- Electrical $232k 3,520k
kWh
$0.072
- Natural Gas $143k 26k
MMBtu
$6.58

170

Recommendations

8.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $65k 3.7k
MMBtu
6.1%
- Electrical $27k 364k
kWh
10.3%
- Natural Gas $30k -
MMBtu
-
Waste $24k
Productivity/Other $42k
TOTAL $131k
*May be negative reflecting an increased cost component required to save energy and costs overall

19

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $432k 59k
MMBtu
$9.65
- Electrical $207k 3,161k
kWh
$0.073
- Natural Gas $145k 27k
MMBtu
$6.17

85

Implemented Recommendations

4.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $23k 2.1k
MMBtu
3.6%
- Electrical $15k 209k
kWh
6.6%
- Natural Gas $1.2k -
MMBtu
-
Waste $0.3k
Productivity/Other $2.0k
TOTAL $25k
*May be negative reflecting an increased cost component required to save energy and costs overall