ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Spring and wire product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

57

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $611k 84k
MMBtu
$9.07
- Electrical $340k 5,497k
kWh
$0.069
- Natural Gas $160k 27k
MMBtu
$6.45

497

Recommendations

8.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $79k 7.3k
MMBtu
8.8%
- Electrical $43k 716k
kWh
13.0%
- Natural Gas $18k -
MMBtu
-
Waste $9.6k
Productivity/Other $22k
TOTAL $110k
*May be negative reflecting an increased cost component required to save energy and costs overall

54

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $605k 84k
MMBtu
$8.99
- Electrical $336k 5,485k
kWh
$0.069
- Natural Gas $164k 28k
MMBtu
$6.40

213

Implemented Recommendations

3.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $30k 3.0k
MMBtu
3.5%
- Electrical $17k 292k
kWh
5.3%
- Natural Gas $3.5k -
MMBtu
-
Waste $0.1k
Productivity/Other $0.8k
TOTAL $31k
*May be negative reflecting an increased cost component required to save energy and costs overall