ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
NAICS 332510 Hardware manufacturing

23

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $388k 50k
MMBtu
$9.58
- Electrical $216k 3,456k
kWh
$0.076
- Natural Gas $84k 15k
MMBtu
$6.46

190

Recommendations

8.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $83k 6.2k
MMBtu
12.3%
- Electrical $45k 606k
kWh
17.6%
- Natural Gas $16k -
MMBtu
-
Waste $2.2k
Productivity/Other $90k
TOTAL $176k
*May be negative reflecting an increased cost component required to save energy and costs overall

20

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $384k 50k
MMBtu
$9.70
- Electrical $224k 3,478k
kWh
$0.079
- Natural Gas $84k 15k
MMBtu
$5.83

86

Implemented Recommendations

4.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $32k 2.2k
MMBtu
4.4%
- Electrical $17k 218k
kWh
6.3%
- Natural Gas $11k -
MMBtu
-
Waste $0.2k
Productivity/Other $93k
TOTAL $125k
*May be negative reflecting an increased cost component required to save energy and costs overall