ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Hardware manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

22

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $397k 52k
MMBtu
$9.61
- Electrical $223k 3,536k
kWh
$0.078
- Natural Gas $86k 15k
MMBtu
$6.29

182

Recommendations

8.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $85k 6.4k
MMBtu
12.3%
- Electrical $47k 622k
kWh
17.6%
- Natural Gas $16k -
MMBtu
-
Waste $2.3k
Productivity/Other $95k
TOTAL $182k
*May be negative reflecting an increased cost component required to save energy and costs overall

19

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $396k 53k
MMBtu
$9.23
- Electrical $232k 3,631k
kWh
$0.075
- Natural Gas $87k 15k
MMBtu
$5.40

80

Implemented Recommendations

4.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $33k 2.3k
MMBtu
4.4%
- Electrical $17k 226k
kWh
6.2%
- Natural Gas $11k -
MMBtu
-
Waste $0.2k
Productivity/Other $98k
TOTAL $131k
*May be negative reflecting an increased cost component required to save energy and costs overall