ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Other metal container manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

31

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $489k 67k
MMBtu
$9.31
- Electrical $226k 3,680k
kWh
$0.074
- Natural Gas $185k 28k
MMBtu
$7.74

229

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $53k 3.9k
MMBtu
5.8%
- Electrical $26k 380k
kWh
10.3%
- Natural Gas $13k -
MMBtu
-
Waste $12k
Productivity/Other $30k
TOTAL $96k
*May be negative reflecting an increased cost component required to save energy and costs overall

29

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $471k 66k
MMBtu
$9.33
- Electrical $210k 3,475k
kWh
$0.075
- Natural Gas $189k 29k
MMBtu
$7.66

106

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $25k 2.2k
MMBtu
3.3%
- Electrical $16k 214k
kWh
6.2%
- Natural Gas $3.7k -
MMBtu
-
Waste $11k
Productivity/Other $12k
TOTAL $48k
*May be negative reflecting an increased cost component required to save energy and costs overall