ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Metal can manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

59

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,440k 231k
MMBtu
$7.15
- Electrical $770k 15,470k
kWh
$0.057
- Natural Gas $391k 72k
MMBtu
$7.08

453

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $132k 17k
MMBtu
7.2%
- Electrical $82k 1,631k
kWh
10.5%
- Natural Gas $21k -
MMBtu
-
Waste $0.9k
Productivity/Other $7.8k
TOTAL $141k
*May be negative reflecting an increased cost component required to save energy and costs overall

51

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,399k 226k
MMBtu
$7.02
- Electrical $732k 15,176k
kWh
$0.055
- Natural Gas $392k 71k
MMBtu
$6.46

217

Implemented Recommendations

4.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $56k 6.9k
MMBtu
3.1%
- Electrical $35k 675k
kWh
4.4%
- Natural Gas $6.3k -
MMBtu
-
Waste $0.0k
Productivity/Other $4.9k
TOTAL $61k
*May be negative reflecting an increased cost component required to save energy and costs overall