ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Metal can manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

62

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,422k 227k
MMBtu
$7.17
- Electrical $754k 15,171k
kWh
$0.056
- Natural Gas $383k 71k
MMBtu
$6.98

474

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $131k 16k
MMBtu
7.1%
- Electrical $79k 1,573k
kWh
10.4%
- Natural Gas $21k -
MMBtu
-
Waste $0.9k
Productivity/Other $7.5k
TOTAL $139k
*May be negative reflecting an increased cost component required to save energy and costs overall

58

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,444k 231k
MMBtu
$7.18
- Electrical $766k 15,528k
kWh
$0.056
- Natural Gas $390k 72k
MMBtu
$7.02

237

Implemented Recommendations

4.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $53k 6.5k
MMBtu
2.8%
- Electrical $34k 635k
kWh
4.1%
- Natural Gas $5.5k -
MMBtu
-
Waste $0.0k
Productivity/Other $4.9k
TOTAL $58k
*May be negative reflecting an increased cost component required to save energy and costs overall