The ITAC Statistics page displays the average assessment results for the selected criteria.
NAICS 332420 Metal tank (heavy gauge) manufacturing

25

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $501k 61k
MMBtu
$9.85
- Electrical $261k 3,673k
kWh
$0.075
- Natural Gas $149k 23k
MMBtu
$7.35

205

Recommendations

8.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $103k 6.5k
MMBtu
10.6%
- Electrical $67k 631k
kWh
17.2%
- Natural Gas $9.2k -
MMBtu
-
Waste $0.2k
Productivity/Other $74k
TOTAL $177k
*May be negative reflecting an increased cost component required to save energy and costs overall

23

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $533k 66k
MMBtu
$9.62
- Electrical $277k 3,927k
kWh
$0.075
- Natural Gas $160k 24k
MMBtu
$7.60

106

Implemented Recommendations

4.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $33k 0.3k
MMBtu
0.4%
- Electrical $8.3k 26k
kWh
0.7%
- Natural Gas $6.3k -
MMBtu
-
Waste $0.1k
Productivity/Other $75k
TOTAL $108k