ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Metal tank (heavy gauge) manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

26

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $499k 60k
MMBtu
$10.03
- Electrical $262k 3,635k
kWh
$0.076
- Natural Gas $144k 22k
MMBtu
$7.31

212

Recommendations

8.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $104k 6.6k
MMBtu
11.0%
- Electrical $68k 641k
kWh
17.6%
- Natural Gas $8.8k -
MMBtu
-
Waste $0.2k
Productivity/Other $71k
TOTAL $175k
*May be negative reflecting an increased cost component required to save energy and costs overall

24

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $517k 63k
MMBtu
$9.74
- Electrical $271k 3,804k
kWh
$0.077
- Natural Gas $154k 23k
MMBtu
$7.29

106

Implemented Recommendations

4.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $31k 0.3k
MMBtu
0.4%
- Electrical $7.9k 24k
kWh
0.6%
- Natural Gas $6.0k -
MMBtu
-
Waste $0.1k
Productivity/Other $72k
TOTAL $104k
*May be negative reflecting an increased cost component required to save energy and costs overall