ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Metal tank (heavy gauge) manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

25

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $501k 61k
MMBtu
$9.85
- Electrical $261k 3,673k
kWh
$0.075
- Natural Gas $149k 23k
MMBtu
$7.35

205

Recommendations

8.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $103k 6.5k
MMBtu
10.6%
- Electrical $67k 631k
kWh
17.2%
- Natural Gas $9.2k -
MMBtu
-
Waste $0.2k
Productivity/Other $74k
TOTAL $177k
*May be negative reflecting an increased cost component required to save energy and costs overall

23

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $533k 66k
MMBtu
$9.62
- Electrical $277k 3,927k
kWh
$0.075
- Natural Gas $160k 24k
MMBtu
$7.60

106

Implemented Recommendations

4.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $33k 0.3k
MMBtu
0.4%
- Electrical $8.3k 26k
kWh
0.7%
- Natural Gas $6.3k -
MMBtu
-
Waste $0.1k
Productivity/Other $75k
TOTAL $108k
*May be negative reflecting an increased cost component required to save energy and costs overall