ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Power boiler and heat exchanger manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

17

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $538k 76k
MMBtu
$7.77
- Electrical $247k 4,483k
kWh
$0.059
- Natural Gas $172k 30k
MMBtu
$5.50

139

Recommendations

8.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $68k 6.2k
MMBtu
8.1%
- Electrical $35k 606k
kWh
13.5%
- Natural Gas $17k -
MMBtu
-
Waste $2.7k
Productivity/Other $19k
TOTAL $89k
*May be negative reflecting an increased cost component required to save energy and costs overall

16

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $481k 70k
MMBtu
$7.73
- Electrical $224k 3,957k
kWh
$0.060
- Natural Gas $158k 30k
MMBtu
$5.21

63

Implemented Recommendations

3.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $27k 2.7k
MMBtu
3.9%
- Electrical $16k 267k
kWh
6.7%
- Natural Gas $4.4k -
MMBtu
-
Waste $0.0k
Productivity/Other $16k
TOTAL $43k