Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Power boiler and heat exchanger manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

18

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $516k 73k
MMBtu
$8.11
- Electrical $235k 4,254k
kWh
$0.060
- Natural Gas $165k 29k
MMBtu
$5.63

143

Recommendations

7.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $65k 5.9k
MMBtu
8.2%
- Electrical $34k 580k
kWh
13.6%
- Natural Gas $16k -
MMBtu
-
Waste $2.6k
Productivity/Other $18k
TOTAL $85k
*May be negative reflecting an increased cost component required to save energy and costs overall

17

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $538k 76k
MMBtu
$7.77
- Electrical $247k 4,483k
kWh
$0.059
- Natural Gas $172k 30k
MMBtu
$5.50

67

Implemented Recommendations

3.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $27k 2.8k
MMBtu
3.6%
- Electrical $16k 271k
kWh
6.1%
- Natural Gas $4.2k -
MMBtu
-
Waste $0.0k
Productivity/Other $17k
TOTAL $44k
*May be negative reflecting an increased cost component required to save energy and costs overall