ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Boiler, tank, and shipping container manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

132

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $922k 140k
MMBtu
$8.25
- Electrical $478k 9,052k
kWh
$0.065
- Natural Gas $269k 47k
MMBtu
$7.08

1,026

Recommendations

7.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $100k 10k
MMBtu
7.4%
- Electrical $60k 1,016k
kWh
11.2%
- Natural Gas $16k -
MMBtu
-
Waste $3.7k
Productivity/Other $27k
TOTAL $131k
*May be negative reflecting an increased cost component required to save energy and costs overall

119

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $882k 135k
MMBtu
$8.18
- Electrical $448k 8,642k
kWh
$0.064
- Natural Gas $266k 46k
MMBtu
$6.81

492

Implemented Recommendations

4.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $40k 3.9k
MMBtu
2.9%
- Electrical $23k 382k
kWh
4.4%
- Natural Gas $5.4k -
MMBtu
-
Waste $2.7k
Productivity/Other $22k
TOTAL $64k
*May be negative reflecting an increased cost component required to save energy and costs overall