ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Boiler, tank, and shipping container manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

134

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $917k 139k
MMBtu
$8.27
- Electrical $476k 9,006k
kWh
$0.065
- Natural Gas $266k 47k
MMBtu
$7.09

1,038

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $100k 10k
MMBtu
7.4%
- Electrical $60k 1,013k
kWh
11.2%
- Natural Gas $16k -
MMBtu
-
Waste $3.7k
Productivity/Other $27k
TOTAL $130k
*May be negative reflecting an increased cost component required to save energy and costs overall

121

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $890k 136k
MMBtu
$8.18
- Electrical $455k 8,724k
kWh
$0.064
- Natural Gas $266k 46k
MMBtu
$7.07

497

Implemented Recommendations

4.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $40k 3.9k
MMBtu
2.9%
- Electrical $22k 380k
kWh
4.4%
- Natural Gas $5.3k -
MMBtu
-
Waste $2.7k
Productivity/Other $22k
TOTAL $64k
*May be negative reflecting an increased cost component required to save energy and costs overall