Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Ornamental and architectural metal work manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

17

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $396k 58k
MMBtu
$8.91
- Electrical $202k 3,593k
kWh
$0.067
- Natural Gas $100k 21k
MMBtu
$5.25

124

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $44k 3.9k
MMBtu
6.7%
- Electrical $21k 378k
kWh
10.5%
- Natural Gas $7.9k -
MMBtu
-
Waste -
Productivity/Other $9.1k
TOTAL $53k
*May be negative reflecting an increased cost component required to save energy and costs overall

15

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $418k 63k
MMBtu
$7.63
- Electrical $208k 3,912k
kWh
$0.055
- Natural Gas $110k 23k
MMBtu
$5.09

43

Implemented Recommendations

2.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $13k 1.7k
MMBtu
2.6%
- Electrical $7.9k 164k
kWh
4.2%
- Natural Gas $1.5k -
MMBtu
-
Waste -
Productivity/Other $1.0k
TOTAL $14k
*May be negative reflecting an increased cost component required to save energy and costs overall