ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Sheet metal work manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

84

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $598k 82k
MMBtu
$12.50
- Electrical $300k 6,925k
kWh
$0.081
- Natural Gas $82k 11k
MMBtu
$7.13

582

Recommendations

6.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $51k 3.9k
MMBtu
4.7%
- Electrical $28k 381k
kWh
5.5%
- Natural Gas $11k -
MMBtu
-
Waste $1.7k
Productivity/Other $35k
TOTAL $88k
*May be negative reflecting an increased cost component required to save energy and costs overall

76

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $624k 89k
MMBtu
$12.10
- Electrical $313k 7,505k
kWh
$0.079
- Natural Gas $84k 11k
MMBtu
$6.65

229

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $18k 1.7k
MMBtu
1.9%
- Electrical $11k 165k
kWh
2.2%
- Natural Gas $2.3k -
MMBtu
-
Waste $0.5k
Productivity/Other $15k
TOTAL $33k
*May be negative reflecting an increased cost component required to save energy and costs overall