ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Sheet metal work manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

93

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $586k 80k
MMBtu
$12.17
- Electrical $291k 6,673k
kWh
$0.079
- Natural Gas $79k 11k
MMBtu
$7.08

661

Recommendations

7.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $52k 4.2k
MMBtu
5.2%
- Electrical $28k 406k
kWh
6.1%
- Natural Gas $11k -
MMBtu
-
Waste $1.5k
Productivity/Other $40k
TOTAL $94k
*May be negative reflecting an increased cost component required to save energy and costs overall

91

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $591k 81k
MMBtu
$12.18
- Electrical $294k 6,761k
kWh
$0.080
- Natural Gas $79k 11k
MMBtu
$6.93

286

Implemented Recommendations

3.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $18k 1.6k
MMBtu
2.0%
- Electrical $10k 161k
kWh
2.4%
- Natural Gas $2.2k -
MMBtu
-
Waste $0.4k
Productivity/Other $13k
TOTAL $31k
*May be negative reflecting an increased cost component required to save energy and costs overall