ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Sheet metal work manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

85

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $592k 81k
MMBtu
$12.48
- Electrical $298k 6,853k
kWh
$0.082
- Natural Gas $81k 11k
MMBtu
$7.15

590

Recommendations

6.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $51k 3.9k
MMBtu
4.8%
- Electrical $28k 381k
kWh
5.6%
- Natural Gas $11k -
MMBtu
-
Waste $1.7k
Productivity/Other $35k
TOTAL $88k
*May be negative reflecting an increased cost component required to save energy and costs overall

81

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $613k 85k
MMBtu
$12.37
- Electrical $308k 7,145k
kWh
$0.082
- Natural Gas $84k 11k
MMBtu
$6.94

240

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $17k 1.6k
MMBtu
1.9%
- Electrical $10k 158k
kWh
2.2%
- Natural Gas $2.1k -
MMBtu
-
Waste $0.4k
Productivity/Other $14k
TOTAL $31k
*May be negative reflecting an increased cost component required to save energy and costs overall