ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Plate work manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

32

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $316k 41k
MMBtu
$9.08
- Electrical $186k 2,914k
kWh
$0.070
- Natural Gas $72k 10k
MMBtu
$6.09

228

Recommendations

7.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $48k 3.4k
MMBtu
8.4%
- Electrical $26k 334k
kWh
11.5%
- Natural Gas $14k -
MMBtu
-
Waste $1.8k
Productivity/Other $25k
TOTAL $75k
*May be negative reflecting an increased cost component required to save energy and costs overall

28

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $323k 43k
MMBtu
$8.77
- Electrical $191k 3,076k
kWh
$0.069
- Natural Gas $77k 11k
MMBtu
$6.09

93

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $13k 1.0k
MMBtu
2.3%
- Electrical $5.8k 97k
kWh
3.2%
- Natural Gas $4.3k -
MMBtu
-
Waste $0.2k
Productivity/Other $20k
TOTAL $33k
*May be negative reflecting an increased cost component required to save energy and costs overall